Extra Heavy Duty Load Lintel - L5

To achieve loading figures lintel must be built in with blockwork as shown. Ensure all perpendicular and horizontal joints are filled with mortar. Place mortar bed on top of blockwork before floor units are laid to provide even distribution of load. Steel Lintels may be propped to facilitate speed of construction.

This download contans the L5 Extra Heavy Duty Load Lintel created by bimstore.co.uk as a 2D Detail Item for IG Lintels.

This component is created in Revit 2015 and is in line with 2015 industry standards.

The components includes the following types;

  • L5 – 50
  • L5 – 75
  • L5 – 100
  • L5 – 110
  • L5 – 130
  • L5 – 150

2,00 

View cart